- Company: Isaraerospace
- Location: Ottobrunn, Bavaria
- Salary: Pay not listed
Isaraerospace at a glance
Controls & Automation Engineer (m/f/d)
isaraerospace
Ottobrunn, Bavaria
About the Role
At isaraerospace, you will be deeply involved in building and maintaining all kinds of test benches, test sites, and launch sites for subcomponent testing up to launching rockets. This role includes planning, developing, and commissioning control systems (Beckhoff PLC & TwinCAT 3), followed by full lifecycle support, including troubleshooting and upgrading systems.
What You'll Do
- Develop PLC software for new and existing ground systems
- Design PLC hardware setups and topologies
- Perform risk analyses and design safety-critical electrical systems
- Commission control systems and ensure their reliability in harsh environments
- Collaborate with cross-functional teams to integrate control systems into larger projects
What We're Looking For
We are seeking a highly skilled Controls & Automation Engineer who can bring expertise in PLC programming, hardware design, and safety-critical system integration. You should have experience with Beckhoff PLCs and TwinCAT 3, as well as a strong background in electrical engineering and control systems.
Why Join isaraerospace
Joining our team means being part of a dynamic and innovative company dedicated to advancing space technology. You will work on cutting-edge projects that push the boundaries of what’s possible, contributing to missions that could change the future of space exploration.
Ready to Apply?
To apply, complete your application directly on this page, or you'll be redirected to the employer's application platform to finish submitting there.
You’ll finish your application on the employer’s website. We don’t ask for a resume on this page.
Explore Isaraerospace online
Working in Ottobrunn, München (Kreis)
🇩🇪 Relocation safety for Germany: Very Safe — via Warnely, CC BY 4.0
National unemployment rate in Germany: 3.7% — via World Bank
Wage growth in Germany (year over year): 3.4% — via Eurostat
GDP per capita in Germany: $60,496 — via World Bank
Consumer price inflation in Germany: 2.2% (annual) — via World Bank
Real GDP growth in Germany: 0.2% (annual) — via World Bank
Statutory minimum wage in Germany: €2,343/month — via Eurostat
Cost of living in Germany: 9.1% above the EU average — via Eurostat
Job vacancy rate in Germany: 2.8% — via Eurostat
Average hours worked per year in Germany: 1,332 — via OECD
About this role & career path
Traits that fit this role
- Innovation
- Adaptability
- Achievement Orientation
- Intellectual Curiosity
- Attention to Detail
Source: O*NET Work Styles (Distinctiveness Rank).
Typical preparation needed: Job Zone 4: Considerable Preparation Needed. Most of these occupations require a four-year bachelor's degree, but some do not. — via O*NET
Industry news
- The Great Coding Reset: How AI is changing software engineering - Business Insider
- ‘AI code apocalypse’ hasn’t hit engineers as hard as the industry may think - IT Brew
- A former Oracle engineer on an H-1B visa says AI and tech layoffs pushed him into constant career-prep mode - Business Insider Africa
Source: O*NET (public-domain bulk data)
Salary & compensation
Workers in Computer & Mathematical occupations earn a national median of $98,769 — via US Census ACS / Data USA
Job details above are provided by the employer/source. The sections on this page are compiled from public data sources with AI assistance.
Accommodations: if you need a workplace accommodation to apply for or perform this job, see ADA.gov or EEOC.gov for guidance on your rights and how to request one.
Listing facts
- Role Controls & Automation Engineer
- Employer Isaraerospace
- Location Ottobrunn, Bavaria
- Type Full Time
- Pay (from listing) Pay not listed
- Posted July 31, 2026
- Apply by August 30, 2026
- Country Germany
- Overview Full job description on this page (228 words)
Facts above come from this job record on Get A Job.AI — not copied from third-party review sites.
Typical work in Controls & Automation Engineer (m/f/d)
Independent occupational context from O*NET (U.S. public-domain labor data). This is about the occupation, not a rewrite of this employer's posting.
- Analyze information to determine, recommend, and plan installation of a new system or modification of an existing system.
- Analyze user needs and software requirements to determine feasibility of design within time and cost constraints.
- Confer with data processing or project managers to obtain information on limitations or capabilities for data processing projects.
- Confer with systems analysts, engineers, programmers and others to design systems and to obtain information on project limitations and capabilities, performance requirements and interfaces.
- Consult with customers or other departments on project status, proposals, or technical issues, such as software system design or maintenance.
- Coordinate installation of software system.
Limited public data for this employer
We only show facts we can ground in public sources (Wikidata, O*NET, news/discussion links, or this listing). We do not invent Glassdoor-style ratings, salaries, or testimonials when data is thin. Use the listing facts, occupation context, and related openings below while we continue researching.
Explore related openings
Occupation family: Controls & Automation Engineer (m/f/d)
Research this employer
Pull public facts we already cached for this company (Wikipedia, news, discussions). We never invent Glassdoor-style ratings.
Open interview kit (print-friendly)
Free for candidates — daily or weekly emails when matching roles go live.
Keep exploring on Get A Job.ai
Not quite the right fit? Your next opportunity is a click away.
- Browse all jobs
- More jobs by category
- Remote jobs you can do from anywhere
- Research typical pay for this role
- Get free job alerts so new matches reach you first
- Upload your resume to apply faster
- Register now to access our free AI resume builder
Hiring instead? Post a job and reach candidates searching right now.
