POLK Mechanical
POLK Mechanical is seeking a Full-Time Construction Scheduler to join its team in Grand Prairie, Dallas.
About the Role
In this position you will create and maintain accurate project timelines that keep mechanical construction projects on track from start to finish.
What You'll Do
- Develop baseline and updated schedules using Primavera P6, ensuring all activities are sequenced correctly.
- Track progress against the plan, pinpoint critical path items, and suggest corrective or recovery measures when variances occur.
- Carry out Time Impact Analyses (TIA), assemble fragnets, and draft schedule narratives that justify delay claims or change orders.
- Produce resource‑loaded and cost‑loaded schedules, integrating manpower, equipment, and material forecasts.
- Collaborate with project managers, estimators, and field crews to gather input and keep stakeholders informed of schedule status.
- Perform regular schedule updates, incorporate change orders, and maintain a historical record of revisions.
- Assist in preparing monthly progress reports and presentations for client meetings.
What We're Looking For
- Proven experience as a construction scheduler, preferably in mechanical or HVAC projects.
- Proficiency with Primavera P6 and familiarity with Microsoft Project or similar scheduling tools.
- Strong understanding of critical path method, float analysis, and schedule risk assessment.
- Ability to read and interpret construction drawings, specifications, and contracts.
- Excellent analytical skills with a keen eye for detail and a proactive approach to problem‑solving.
- Effective communication abilities, comfortable presenting schedule data to technical and non‑technical audiences.
- Bachelor’s degree in construction management, engineering, or a related field, or equivalent practical experience.
- Authorization to work in the United States; relocation assistance may be considered for qualified candidates.
About POLK Mechanical
POLK Mechanical is a respected mechanical contractor serving the Dallas‑Fort Worth metroplex, delivering high‑quality HVAC, plumbing, and piping solutions for commercial, industrial, and institutional clients. The company values safety, craftsmanship, and collaborative teamwork, offering employees opportunities to grow technically and professionally on diverse projects.
How to Apply
To apply, complete your application directly on this page, or you'll be redirected to the employer's application platform to finish submitting there.
To apply for this job please visit www.adzuna.com.
Terms used in this posting
- relocation assistance
- The employer may help cover some or all costs of moving to take the job, such as moving expenses or temporary housing.
Explore POLK Mechanical online
Working in Grand Prairie, Dallas
Market context
- Similar listings in Grand Prairie, Dallas 1
Job details above are provided by the employer/source. The sections on this page are compiled from public data sources with AI assistance.
Accommodations: if you need a workplace accommodation to apply for or perform this job, see ADA.gov or EEOC.gov for guidance on your rights and how to request one.
Keep exploring on Get A Job.ai
Not quite the right fit? Your next opportunity is a click away.
- Browse all jobs
- More jobs by category
- Remote jobs you can do from anywhere
- Research typical pay for this role
- Set a job alert so new matches reach you first
- Upload your resume to apply faster
Hiring instead? Post a job and reach candidates searching right now.
